Sander data center site – map

Slomarka
Short term capacity:
9 MW
Long term capacity:
50 MW
Site area:
1.000.000 m2
Rudshøgda sør
Short term capacity:
9 MW
Long term capacity:
40 MW
Site area:
50.000 m2
Lalm
Short term capacity:
10 MW
Long term capacity:
100 MW
Site area:
12200 m2
Krabyskogen
Short term capacity:
9 MW
Long term capacity:
15 MW
Site area:
80.000 m2
Grundsetmoen
Short term capacity:
9 MW
Long term capacity:
100 MW
Site area:
400.000 m2
Grue Industry Park
Short term capacity:
10 MW
Long term capacity:
10 MW
Site area:
30.000 m2
Heggvin
Short term capacity:
0 MW
Long term capacity:
150 MW
Site area:
1.000.000 m2
Tylldalen
Short term capacity:
1 MW
Long term capacity:
100 MW
Site area:
1.000.000 m2
Plassen
Short term capacity:
5 MW
Long term capacity:
25 MW
Site area:
72.000 m2
Åkrestrømmen
Short term capacity:
1 MW
Long term capacity:
100 MW
Site area:
1 500 000 m2
Oslo airport, Gardermoen
International airport.
Røros airport
Map legends:
Existing powerline 300kV
Existing powerline 132kV
Existing powerline 66kV
Potential powerline 300kV
Potential powerline 132kV
DC site
Airport
Power transformer
Powerplant
Fiber connection points
Flag of Germany Auf Deutsch >