Ringsaker

Rudshøgda sør

Rudshøgda sør, Ringsaker Data Center Site

The Rudshøgda site has an option agreement.

Central site in the Mjøsa City Region

Short term capacity
9 MW
Long term capacity
40 MW
Site area - Greenfield
50.000 m2

About Ringsaker

Ringsaker (31.000 inhabitants) with the two towns of Moelv and Brumunddal is a central part of the Mjøsa City Region with 180 000 inhabitants. Agriculture, food, trade, industry and logistics are the most important businesses. The cities of Hamar and Lillehammer and the industrial clusters of Cyber Security and Manufacturing at Gjøvik/ Raufoss are all within 35 min travel. Read more

LOCATION AND OWNER

  • Address: Rudshøgda næringsområde, Ringsaker municipality, Norway
  • Coordinates: 60°54′17.91″ N 10°49′26.73″ E
  • Map: https://goo.gl/maps/ZerSYaWFB322
  • Surroundings: Forest
  • Owned by: Ringsaker municipality

SITE AND CONSTRUCTION

  • Site area: 50.000 m2 (5 ha) greenfield
  • Topography: Varied
  • Type of site: Green field
  • Shape: Irregular pentagon
  • Utilization: 70%
  • Construction: Easy deforestation, due to thin soil. Well suited for construction.
  • Max building height: 20 m

ELECTRICITY AND GRID

  • Short term potential: (<6 months): 9 MW
  • Mid term potential (18 – 24 months): 40 MW
  • Long term potential (36 – 60 months 40 MW
  • Grid: 66 kV

Transformer 66 kV 700 m from site. For more information regarding electricity and grid capacity contact us. All infrastructure upgrades is required to comply with Norwegian regulation processes.

CONNECTIVITY

  • Dark fiber: Two independent international feeds with possibility for one more Telenor infrastructure TBA, possible one/ two routes to be verified.
  • Operators: Eidsiva, Telenor.
  • Connect EU: Ringsaker is close to Eidsiva and Telenor main fiber routes going towards Oslo, Stockholm and mainland Europe. Possibilities to connect to major international operators in Oslo / Stockholm.

PLANNING AND PERMITTING

  • Regulations: Regulated for industry. Ordinary building permits are required
  • Zoning: Zoned for industrial purposes.
  • Road: Yes, on site
  • Water/Sanitary: Yes, on site. New water/ sanitary at customer needs

SITE ACCESS

  • Highway: E6 (main highway) passing site
  • Access: Existing road access to the site
  • Int. airport: OSL Gardermoen, 1h 28 min, 107 km
  • Train: Moelv st., 9,5 km